6 projects across California, 3 of them active. Each is written up like a report: the setting, my role, what I did and what came of it.

  1. 01 Sulphur Bank Mercury Mine A former mercury mine on the shore of Clear Lake, now a federal Superfund cleanup. I helped lead the 2025 pre-design test-pit, soil-boring and boulder XRF campaigns that fed the remedial design, and now lead the construction effort for Phase 1, the cleanup of residential yards. Superfund mercury mine — pre-design investigation & remediation Clearlake Oaks, CA May 2025 — Present Active Film · 1:04
  2. 02 City of Roseville — Closed Landfill Compliance Monitoring Deputy project manager for Title 27 compliance at the City of Roseville’s closed, unlined landfill: coordinating the semiannual groundwater sampling, running the landfill gas monitoring, and helping write the reports the Regional Water Board relies on. Closed MSW landfill — post-closure monitoring Roseville, CA Jan 2025 — Present Active
  3. 03 PG&E Bakersfield MGP The cleanup of an 1880s gas plant site in downtown Bakersfield under DTSC oversight. I worked it end to end: characterization, the scope of work and specifications, field engineer through construction, and the software that turns perimeter air, noise and vibration monitoring into live data and daily reports. Former manufactured gas plant — DTSC cleanup Bakersfield, CA Sep 2023 — Present Active
  4. 04 Woodville Landfill — Southern Phase Cell Expansion Design, and construction quality assurance on parts of the build, for a new lined disposal cell at Tulare County’s Woodville Landfill: capacity for a county that is consolidating its landfills. Active Class III MSW landfill — new lined cell Tulare County, CA 2024 — 2025 Complete Film · 5:00
  5. 05 Travis AFB — SERDP PFAS Study Field work for a SERDP-funded PFAS study with a sharp question: can the tubing used to sample a monitoring well add PFAS to the sample? Existing and new tubing were tested side by side across about half a dozen wells. PFAS research & field study Travis AFB, Fairfield, CA Jun 2025 — Jun 2025 Complete
  6. 06 Colton Sanitary Landfill — Final Cover & LFG System Third-party construction quality assurance on the new landfill gas collection system built with the final closure of an 88-acre landfill in Colton: extraction wells drilled into the waste, and new headers and laterals. Closed MSW landfill — final closure construction Colton, CA Oct 2022 — Jul 2024 Complete